COMMODITY/SERVICE SOUGHT: Verde Ditch Piping Installation Services Grief Wash
SOLICITATION NO.: WC1-058-2023-01
PROPOSAL DUE DATE AND TIME: September 18, 2025 – 5:00 p.m. Arizona Local Time
LOCATION: Email

The Verde NRCD (“district”) is seeking sealed bids (“Bids”) from qualified Vendors (“Vendors”) capable of providing the following goods and/or services:

Verde Ditch Piping Installation Services Grief Wash

Schedule of Events:

Questions Due Date: September 8, 2025 – 5:00 p.m.
Submittal Due Date: September 18, 2025 – 5:00 p.m.
Submittal Location: Via email to alicia@aliciapeckconsulting.com

The scope of work for this project includes: 

  • Procurement of 5,000 LF of 48” IPS DR 32.5 HDPE pipe and 200 LF of 48” IPS DR 26 HDPE pipe, appropriate turnouts, and the requisite concrete structures specified within the comprehensive engineering design
  • Undertaking land preparation activities, encompassing the clearance of trees, shrubs, as well as the smoothing, leveling, and precise grading of the ditch. These efforts aim to align with the specified elevations articulated within the engineering design
  • Fusion welding of pipes using a fusion machine provided by the Vendor
  • Installation of turnouts and structures in accordance with the detailed engineering design
  • Backfilling of the pipeline that will be done using source fill and in accordance with engineering specifications, ensuring structural integrity and optimal functionality
  • Ensuring strict compliance with Occupational Safety and Health Administration (OSHA) guidelines for safety during all phases of construction is imperative

Questions may be submitted via email to Alicia Peck at alicia@aliciapeckconsulting.com.

Downloads:

RFP Information PDF
RFP Map